一品楼凤楼论坛最新消息,武汉品茶Q群联系方式,珠海约茶联系方式

上海金泰工程机械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

Shanghai Jintai Presenting the largest width hydraulic diaphragm wall grab with 1.5m in China

2009-02-23

    At present, SG 40A hydraulic diaphragm wall grab made by Shanghai Jintai struts its stuff during the construction of Changjiang tunnel of Wuhan subway line 2. The grab with 1.5m width and 2100L volume is the largest in China and finished 1.5m width and 48m depth notch within 13 hours, which created new record in width formation and construction efficiency of diaphragm wall construction.


 


    The Changjiang tunnel project of Wuhan subway line 2 is complex in geological situation with upper soft layer and lower rigid layer. The backfill soil layer and clay layer are between 1m and 15m under ground, sand layer is 16m—48m under ground and cobble and sand layers are 48m under ground. The tunnel project has very high construction requirement, for example, even if the foreign machine is used, the high cost and low efficiency will be incurred. But the 1.5m hydraulic diaphragm wall grab made by Jintai has solved such problem and won the good praise from the customers.

    The successful presence of SG 1500 hydraulic diaphragm wall grab indicates that Shanghai Jintai has stepped further, which reduces the cost, provides the important guarantee to the country’s infrastructure construction and has profound meaning to piling machinery industry in our country.

主站蜘蛛池模板: 内丘县| 英吉沙县| 张家川| 耿马| 万荣县| 岚皋县| 郎溪县| 贵南县| 静海县| 始兴县| 行唐县| 焉耆| 柳林县| 张掖市| 天气| 昌邑市| 建阳市| 陇川县| 秭归县| 天祝| 镇安县| 赤峰市| 宣化县| 新竹市| 皮山县| 宁武县| 五峰| 巴南区| 汾西县| 韩城市| 岳西县| 汾阳市| 甘洛县| 太仆寺旗| 八宿县| 崇文区| 定襄县| 加查县| 白山市| 泽库县| 康马县|